Baykee’s 40kva and 60kva ups used in the project of “sponge city” in Baoshan


November 29, 2018 International City Pipeline Exhibition Smoothly ended, Space Shuttle Baykee made a wonderful appearance. During the exhibition, many interested customers were stopped to talk. Our workers have introduced our BK-GL series ups 20kva 30kva to them, besides the visitors all are well acknowledged about our products and company. Greatly increase the brand awareness in the pipe industry.
Referring to the underground pipe gallery, we hit the iron Come and talk about the "sponge city" associated with it.In recent years, problems such as shackles and water shortages in cities have become increasingly serious. Seeing the sea every rain has become a common problem in many cities. Sponge City as a new type of construction mode, It has received much attention and optimism.
Sponge City: As the name implies, the land is like a sponge. When it rains, it can be absorbed locally, absorbed, infiltrated, infiltrated, Purify rainwater, replenish groundwater, and regulate water circulation;In the case of drought and water shortage, it is conditional to release the stored water. And use it as a water resource management strategy and method.
The application of no break ups in the project”sponge city” is very widely and important.
The construction of the sponge city not only effectively alleviates the problem of urban shackles,It can also alleviate the shortage of water resources and the deterioration of water quality in China. Providing support for the establishment of a benign aquatic ecosystem,It can also improve our living environment. Add color to the city's humanities and natural landscapes.


As a city development concept and construction method, an important symbol of transformation, there are more than 140 cities across the country
Formulate a sponge city construction plan, underground integrated pipe gallery as a sponge city. An important part of the construction, the safe and reliable operation of each system has become a top priority.

Recently, Aerospace Baykee's pipe gallery emergency power supply solution
Successfully participated in another city pipe gallery project -Comprehensive road corridor project for urban roads in downtown Baoshan, Yunnan Province; Building a “Sponge City” for Baoshan City Eliminate the obstacles of power outages and power outages.

What is the character of Baykee’s BK-GL series EPS and ups 20kva and 30kva?
More option for choose: Centralized configuration emergency power supply. Partitioned integrated emergency power suppl. Terminal configuration emergency power supply.
Extend the using life of battery.
Guard the power safety of the city’s communication, transportation lighting and monitoring system.
Specially designed for the Pipe Gallery industry. More professional and higher efficiency.
Baykee’s ups covers different industry, financial: modular ups.Data center: modular ups. 300kva ups. Railway and metro: Emergency power source EPS BK-D series, FEPS series. Manufacture:CHP series 40kva and 60kva ups. Aerospace: some intelligent ups designed for aerospace and airplane.  

2019年9月9日星期一

How to install an off grid solar inverter? How to connect the mppt solar charge controller with your solar panel?

After purchasing an off grid solar inverter, somebody are worried about how
to install, and to take full use of solar power. There are following steps need to
notice:
1.Prepare all the necessary products need to install. 30kva off grid solar inverter,
MPPT solar charge controller, PV distribution box, 300watts solar PV panel, gel
battery or ups battery.
2.Check your off grid solar inverter, mppt solar charge controller and other necessary
 accessories. Before opening the PV inverter, please check the outer packaging for
damage. After unpacking, check the PV inverter for damage or missing accessories.
In the event of damage or missing accessories, please contact the purchased PV
inverter manufacturer.
3.Read all the user manual before installed. All the installation must under the
instruction of the professional technician.
4.Choose a suitable places to put your large solar inverter, the solar inverter must
get close to the battery, and mppt solar charge controller.
5.For safety reasons, DC and AC breaker breakers must be switched off when
removing PV off grid solar inverters from the grid and PV modules. If an inverter
with DC light is selected, then you will also need to purchase an AC breaker.
6.Baykee’s 30kva solar inverter, PV1 and pv2, each pv can connect 44kw solar
panel, and if connected with the solar pv panel, please keep the solar panel DC
from 600vdc to 800vdc.
How to connect the mppt solar charge controller with your solar panel?
1.Our MPPT solar charge controller is from 48V50A to 384V100A, suit for different
off grid solar inverter NK3KW, 5KW, 10kva to 300kva solar inverter
2.48v50a mppt solar charge controller need connect with 75~160VDC solar panel,
if you also need detailed diagram, you can ask for the technician for help.
3.All the installation must guided by the professional technician or refer to the user
manual.
4. This product is a wall-mounted installation. Install as shown below. Can also be
placed inside the Cabinet. Fan flowing from the bottom up, please keep the
following ventilation on the controller.